LATEST NEWS
January 18, 2012
MJMA/PATKAU ARCHITECTS INC. AND LUXIGON
The Goldring Centre for High Performance Sport will house international-level basketball and volleyball courts, a relocated and expanded sport medicine clinic and a range of sport and exercise research labs.
University of Toronto to build $58-million Goldring Centre for sports
The University of Toronto is poised to break ground later this month on the Goldring Centre for High Performance Sport, a state-of-the-art hub for sport and exercise research, sport medicine and training and competition.
In the planning stages for several years, the estimated $58 million centre will house international level basketball and volleyball courts, a relocated and expanded David L. MacIntosh sport medicine clinic, a range of sport and exercise research labs and a strength and fitness centre accessible to all U of T students.
It will also be a venue where the university’s growing list of key partners can converge in support of the region’s top athletes.
“There has been a void within the high performance sport community,” said Prof. Ira Jacobs, dean of the Faculty of Kinesiology & Physical Education, under whose jurisdiction the centre will reside. multiple links:
Related:
Eastern Construction continues work on Rotman School of Management in Toronto
University of Toronto opens $66.5 million computer, math building at Scarborough Campus
Eastern Construction faces tight deadline on University of Toronto project in Mississauaga
EllisDon continues work on George Brown College waterfront campus in Toronto
“We need a place where researchers and scientists can collaborate with coaches, policy-makers, athletes and sport medicine specialists.”
The design-build project is being undertaken by EllisDon. The team includes architects MacLennan Jaunkalns Miller Architects Ltd. of Toronto and Patkau Architects Inc. of Vancouver.
Rosanne Lopers-Sweetman, chief administrative officer for the kinesiology and physical education faculty, said schematic design has been completed for the facility, which will have a gross floor area of 12,000 square metres.
Some progress has been made on preparation of design drawings, she said.
While the official groundbreaking is scheduled for Jan. 31, a date has not yet been set for a start on actual excavation. Prior to a start on construction, the existing site on the downtown St. George campus needs to be cleared. That includes removal of a small building and a shed.
The province’s Ministry of Training, Colleges and Universities is investing $22.5 million in the project, which is scheduled to be completed by January 2015.
The university’s governing council gave the final stamp of approval to build the centre in late November.
| MOST POPULAR STORIES |
- Where does labour law stand on ladder safety?
- Stakeholders react to Ontario College of Trades proposed membership fees
- Cliffs Natural Resources to invest $3.3 billion in Ring of Fire
- Toronto studies construction of new islands
- PCL Constructors works on Humber River Regional Hospital in Toronto
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 455 projects with a total value of $1,378,405,540 that Reed Construction Data Building Reports reported on Thursday.
COMMERCIAL OFFICE BUILDING, RETAIL
$55,000,000 Ottawa ON Negotiated
TOWNHOUSE AND CONDOMINIUM APARTMENT DEVELOPMENT
$43,000,000 Clarington ON CANCELLED/ DEFERRED
$23,000,000 Ottawa-Carleton Reg ON Tenders
| CURRENT STORIES |
- EllisDon to build performing arts centre for Queen’s University in Kingston, Ontario
- Historic Burlington, Ontario railway station to be moved
- Widespread opposition to Ontario College of Trades membership classes
- The hunt for environmentally friendly cement continues with Michigan State University research on portland cement
- Safety training today builds safety leaders of the future, says IHSA
- Denis Dixon new Professional Engineers Ontario president
- University of Windsor design competition winners announced
- Construction material costs “took a breather” in April: Associated General Contractors of America
- VIDEO: Highlights from the May 18 Daily Commercial News
- VIDEO: Common ladder safety errors in construction
- Electrical Worker Crushed
- High School Construction
- Victoria bridge inches closer to construction
- Collapse injures worker at Commonwealth Stadium
- Panel appointed to oversee hearings into B.C. mine project
- Bockstael celebrates 100 years
- More work needed to protect flaggers
- Co-founder of ATCO announces his intention to step down as chair
- SNC-Lavalin hit with $1.5 billion class action lawsuit
- PST returns to British Columbia
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More








