August 25, 2010

VIDEO: B.C. Construction Association welcomes standardized contract forms

Standardized construction documents are long overdue, says the president of the B.C. Construction Association.

“The need for these kinds of contracts here in British Columbia is huge,” Manley McLachlan said.

McLachlan’s comments come as the Canadian Construction Documents Committee puts the final touches on a suite of standard contract forms to be used for construction management.

CCDC 5A is intended for use when the construction manager acts as an agent of the owner, providing advisory services.

The owner contracts directly with the trade contractors to perform the construction work, using a new companion CCDC 17 document.

CCDC 5B is used when the construction manager provides pre-construction advisory services to the owner and then undertakes actual construction.

The construction manager engages trade contractors as subcontractors and is responsible for their performance.

“We see the documents providing clarity for a number of elements of the process,” McLachlan said.

Print | Email | Comment

RECENT VIDEOS

VIDEO: Buildex Vancouver 2012 at the Vancouver Convention Centre

Buildex Vancouver brings together the construction, design and real estate industries on an annual basis into a giant, two day show at the Vancouver Convention Centre.

VIDEO: Pre-Construction begins on the Evergreen Line

Pre-construction work has begun on the Evergreen Line, an extension of the Skytrain rapid transit system that currently spans Vancouver, Richmond, Burnaby and some of Coquitlam. The new line will extend from Coquitlam all the way to Port Moody, alleviating traffic and offering a green alternative to motorized vehicles.

VIDEO: The Vancouver Regional Construction Association's U35 initiative

Construction industry experts have long warned of an "experience gap" between senior management and young workers just entering the sector. Due to the bottoming out of the industry in the 1990s, the industry has lacked a core group of younger managers and executives to take over once the baby boomer generation retires.

Toronto IIDEX trade show to have renewed focus

The Royal Architectural Institute of Canada (RAIC) will be a co-presenter of this year’s IIDEX/NeoCon Canada conference and expo, which has traditionally been a contract furniture show but will start placing a greater emphasis on construction products, architecture and technology, the event organizer has announced.

Brook Restoration safety training includes swing stage, hazardous materials

Brook Restoration recently opened its own safety centre. In addition to regular safety training like WHMIS (Workplace Hazardous Materials Information System), Brook offers training in aspects such as swing stage, boom and elevated work platform, asbestos, lead, Bobcats and confined spaces.

VIDEO: Remembering the Bentall Four

On January 7, 1981, Gunther Couvreux, Brian Stevenson, Donald W. Davis and Yrjo Mitrunen fell thirty-six floors to their deaths when a fly form attached to the Bentall building in downtown Vancouver came loose.

Efficiency is Ontario trades college goal

Ontario’s current apprenticeship system has failed the province’s youth, says the Ontario College of Trades new chair, Ron Johnson.

Ontario College of Trades chair hopes ratios will be reviewed in first two years

Ron Johnson, the new Chair of the Board of Governors of the Ontario College of Trades and Deputy Director of Interior Systems Contractors Association of Ontario and the Interior Finishing Systems Training Centre, said every individual who has an issue with a compulsory certification and ratio review application will have an opportunity to represent their arguments to a review panel.

VIDEO PROFILE: The Peace Bridge in Calgary, Alberta

The Peace Bridge, a pedestrian and cycling bridge crossing the Bow River in Calgary, Alberta is both a bold project in terms of aesthetics and design and a magnet for controversy.

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 326 projects with a total value of $2,707,501,216 that Reed Construction Data Building Reports reported on Friday.

RAPID TRANSIT SYSTEM UPGRADES

$800,000,000 Waterloo Reg ON Prebid

SOLID WASTE FACILITY

$235,700,000 Clarington ON Negotiated

CONDOMINIUM APARTMENT BUILDING

$87,000,000 North York ON CANCELLED/ DEFERRED

Daily Top 10